← All articles

Blog

Dual-Compartment Washers and Batch Records in Indonesia

How Indonesian cleanroom laundries can handle two-compartment washers without mixing batch data, with CPOB and BPOM-audit expectations in mind.

6 min read
  • mid
  • laundry-qc
  • indonesia

If your cleanroom laundry runs a two-compartment (dual) washer in Indonesia, treat each compartment as its own batch with its own record, from loading to release. Never let one record cover both sides. The data that goes wrong in practice is not the machine data. It is the link between a garment lot, a compartment, a wash cycle and a test result.

Why dual washers create a record problem

A two-compartment washer has two drums sharing one cabinet and often one cycle program. The two sides can run at the same time, finish at slightly different moments and carry garments from different customers or different lots.

A single-drum machine gives you a simple chain: lot in, cycle run, lot out. A dual washer gives you two chains running in parallel, and any shortcut in how they are recorded can merge them.

Typical mix-ups:

  • One cycle report is attached to two batches, so each batch appears to have run a cycle it did not.
  • Compartment A and B labels are swapped on paper or in a spreadsheet.
  • Test samples (particle count, moisture, bioburden-related checks) are taken from a garment but logged against the wrong side.
  • A pharmaceutical customer and an electronics customer are washed side by side, and the certificate for one picks up data from the other.

What your customers will expect to see

Indonesian pharmaceutical manufacturers work under CPOB (Cara Pembuatan Obat yang Baik), the national GMP framework issued by BPOM, the Indonesian Food and Drug Authority. You can find BPOM’s regulations through its JDIH legal portal. Check the current CPOB text there, since BPOM updates its rules.

BPOM has also been a PIC/S participating authority since July 2012, according to the PIC/S members page. In practice this means auditors of Indonesian pharmaceutical sites tend to think in PIC/S-aligned terms, including how records and computerised systems are handled. The PIC/S GMP Guide is listed on the PIC/S publications page.

Your laundry is usually a supplier, not the licensed drug manufacturer. But your customer’s quality unit audits you, and what it wants to see is a record it can trust:

  • A unique batch or lot identity that never repeats.
  • A clear statement of which compartment, which cycle and which operator.
  • Test results linked to that identity and not to a shared header.
  • A reviewer who is not the person who ran the batch.
  • A visible history of any correction.

Medical-device, cosmetics, food and electronics customers have their own frameworks, and electronics buyers may ask for ESD and particle results instead of sterility-related checks. The record discipline is the same.

A practical rule: one compartment run, one batch record

The simplest control is also the strictest.

  1. Create two batch records, not one. Even if both compartments start on the same program at the same minute, each gets its own ID.
  2. Record the compartment on the record itself. Use fields such as “washer ID” and “compartment” and do not rely on free text.
  3. Tie each cycle to its batch. The cycle start, end and any alarm should attach to the compartment that produced it.
  4. Keep customers apart. If two customers share a machine, their records, certificates and garment counts must never share a line.
  5. Label physically and digitally. The tag on the garment bundle should match the record ID on the screen, ideally by barcode or QR code instead of handwriting.

A comparison of common approaches

ApproachWhere it worksWhere it fails
Paper logbook, one page per washerSmall volumes, one customerEasy to merge two compartments on one page; slow review
Spreadsheet with a row per batchLow-risk, single-site useOverwrites, no real audit trail, weak access control
Process-system export attached to the batchGood cycle dataOften one export per machine, not per compartment
Quality system with per-compartment batch recordsMixed customers, frequent auditsNeeds setup effort and clear procedures

No tool fixes a vague procedure. If your SOP does not say how to treat compartments, software will only record the confusion faster.

Where mixing actually happens

Most errors we see described in the industry happen at three points.

Loading. The operator loads garments before the batch record exists, then assigns them afterwards. Create the record first.

Unloading. One side finishes earlier and its garments are taken to drying while the other side is still running. If the record is closed per machine rather than per compartment, the early side loses its own timeline.

Testing. Samples are drawn after pooling garments from both sides in the packing area. Draw samples before pooling, and state in the record which compartment each sample came from.

What good looks like in a record

A review-ready dual-washer batch record in an Indonesian setting usually includes:

  • Customer and lot reference, with the customer’s own garment inventory identifiers where used.
  • Washer ID and compartment.
  • Cycle program, start and end time, and any deviation.
  • Operator and, separately, the reviewer.
  • Test results linked to the batch, with the method and the instrument noted.
  • A clear release decision and who made it.
  • A change history showing what was edited, by whom, and why.

On particle counts, laundries commonly use drum-based methods such as Helmke drum testing, and test methods are defined in standards from bodies such as ISO, IEST and ASTM. The exact acceptance limits and method details sit in the current editions of those standards, which are paywalled, so confirm them against the source. Do not copy numbers from a blog, including this one.

Handling deviations and rework

If one compartment fails a test and the other passes, the failed batch is the only one held. This is the clearest benefit of separate records: you can reject, re-wash or investigate one side without touching the other.

If a re-wash is needed, give it a new linked record. Do not overwrite the first result. Auditors read overwritten failures as a data-integrity concern.

Software support and its limits

A quality system can enforce the things people forget: mandatory compartment fields, unique IDs, reviewer separation, locked records after release and an audit trail. That supports your quality unit. It does not make a laundry compliant or validated by itself. Responsibility for compliance, validation and release decisions stays with your quality unit and procedures, and any computerised system should go through your own validation or qualification approach.

A short checklist before your next audit

  • Does every compartment run have its own batch ID?
  • Can you show, for any certificate, which compartment and cycle it came from?
  • Is the reviewer always a different person from the operator?
  • Are corrections visible, dated and attributable?
  • Do your SOPs describe dual-washer handling in plain words?
  • Have you checked your customers’ quality agreements for record requirements?

If you answer “not sure” to two or more, start with the procedure, then decide what tooling would help.

Talk to us

If you are sorting out how to keep dual-washer data apart, we are happy to talk it through with you, with no charge and no obligation. Teknologia Solutions offers our laundry quality control system, and a short conversation will tell you whether it fits your process.


Sources: PIC/S members page (BPOM accession July 2012), PIC/S publications, BPOM, BPOM JDIH regulations portal. Standards such as ISO 14644, ASTM and IEST methods are paywalled and are described here only in general terms. Verify all requirements against primary sources and the current edition of each standard and regulation, and with your customers’ quality agreements.