Validating Quality Software for GMP in Singapore: A Practical Overview

How Singapore cleanroom laundries and their HSA-regulated customers can approach validating quality software: risk-based scope, evidence and ongoing control.

6 min read
  • mid
  • laundry-qc
  • singapore

If you run a cleanroom laundry in Singapore, or buy laundering services for a pharmaceutical, medical-device or semiconductor cleanroom, “validation” will come up the moment test results and release decisions move from paper into software.

The short answer: validating quality software means collecting documented, risk-based evidence that the system does what you intend, reliably, for the records you rely on, and then keeping it under control after go-live. No vendor can hand you a “validated” or “GMP compliant” system. The software supports compliance. Responsibility stays with your quality unit.

Who actually asks for this in Singapore

The pressure rarely comes from the laundry’s own licence. It comes through customers and their regulator.

  • Pharmaceutical manufacturers. The Health Sciences Authority (HSA) states that a company must comply with the Good Manufacturing Practice (GMP) standard before a therapeutic product manufacturer’s licence is granted, and that it adopts the current version of the PIC/S Guide to GMP (PE 009) as that standard. See HSA’s licence overview and its GMP and GDP standards page.
  • Medical-device companies. HSA also regulates medical devices, and device makers typically work under a quality management system such as ISO 13485. Check HSA’s current medical-device guidance for the rules that apply to your customer’s licence type.
  • Biomedical and semiconductor customers. Semiconductor fabs are not under HSA GMP, but they audit supplier quality systems and care about particle and ESD records. Their supplier audits often probe the same things: who changed a result, and can you prove it.

In practice, your customer’s quality or supplier-audit team will ask how you control electronic records. Being ready for that question is the real business case for validation.

What guidance covers computerised systems

HSA’s adoption of the PIC/S GMP Guide matters here because that guide includes an annex on computerised systems. The annex on computerised systems is Annex 11. Read it on the PIC/S site rather than relying on summaries, including ours.

Two other public references are widely used by industry:

A practical approach, step by step

1. Decide what the system is for

Write a short intended-use statement. For a laundry QC system it might cover: recording particle, ESD, moisture and bioburden-related results; linking them to a wash batch; routing results for review; releasing batches; issuing certificates. Everything else follows from this scope.

2. Classify the risk

Not every function carries equal risk. A feature that decides whether a garment batch is released deserves more scrutiny than a cosmetic report layout. Document your reasoning. A risk-based approach is the common thread across the guidance above.

3. Define requirements you can test

Vague wishes cannot be verified. “Results cannot be edited without a reason and a record of the change” can be.

Typical requirements for a laundry include:

  • batch traceability from intake to release
  • role-based access, so the person who enters a result is not the one who approves it
  • an audit trail of creates, edits and approvals
  • password and session controls
  • trend views for results over time
  • certificates that match the underlying records
  • backup and recovery

4. Qualify the vendor and the software

Ask the supplier how the software is developed, tested, versioned and supported, and how changes are released. Ask what documentation you will receive. Keep the answers in your file. For off-the-shelf or cloud tools, your effort goes more into configuration and use than into re-testing the vendor’s code, which is a core idea of the risk-based approach.

5. Test in your own configuration

Run scripted tests against your requirements, using realistic data and your own roles. Include the awkward cases:

  • a result that fails specification
  • a reviewer who tries to approve their own entry
  • an edit after approval
  • an idle session that times out
  • a dual-compartment washer batch
  • a data import that contains a mistake

Record expected result, actual result, who tested and when. Log deviations and how you closed them.

6. Check data migration

If you are moving history from spreadsheets, verify a sample of migrated records against the source. Say in advance how large the sample is and why.

7. Release with procedures and training

The system is only as good as the SOPs around it: user management, review, backup, change control and incident handling. Train people and keep the records. Many problems found in audits come from a gap between what the software allows and what the SOPs say.

8. Stay in control after go-live

Validation is not a one-off. Plan for:

  • Change control. Assess every update or configuration change for impact before it goes live.
  • Periodic review. Check access lists, audit trails, open deviations and system performance on a schedule you define.
  • Version control. Know which software version produced each record.
  • Business continuity. Test restores, not just backups.

Documents an auditor will probably ask for

ItemWhat it shows
Intended use and risk assessmentYou understand the scope
Requirements and test recordsThe system was checked against them
Vendor assessmentThe supplier was evaluated
SOPs and training recordsPeople use it as designed
Change and incident logsThe system stays controlled
User access reviewRoles are still appropriate

The list is a starting point. Your quality unit decides the final package.

Mistakes we see in this kind of project

  • Treating the vendor’s assurance as validation. A vendor’s testing is input to your assessment. It does not replace it.
  • Over-documenting low-risk features while barely testing release and approval logic.
  • Ignoring the audit trail until the first audit.
  • Shared logins at a washing line terminal. They defeat attribution entirely.
  • No plan for updates. Cloud software changes. Decide how you will be notified and assess changes.

Cost and effort

We will not quote figures here, because effort depends on scope, risk and how much documentation already exists. As a planning rule, small laundries should size the effort to the intended use rather than copy a pharma manufacturer’s full package. Budget in S$ for internal quality-unit time as well as vendor fees, since that time is often the larger share.

Where to go from here

Start with a one-page intended-use statement and a simple risk table. They make every later decision, from vendor selection to test depth, easier to defend.

If you would like to talk through how this applies to a Singapore cleanroom laundry, Teknologia Solutions is happy to have a no-charge conversation about our laundry quality control system and what a sensible validation approach could look like for you. No obligation.


Sources: HSA, licence overview; HSA, GMP and GDP standards; PIC/S PI 011-3; ISPE, GAMP 5 Second Edition overview. Regulations, guides and standard editions change. Verify everything against the primary sources and the current editions, and confirm applicability with your quality unit and, where needed, HSA. This article is general information, not regulatory or legal advice.